Tools And Materials - Kohler K-1110 Installation Manual

Bath with airjets
Hide thumbs Also See for K-1110:
Table of Contents

Advertisement

Available languages

Available languages

Before You Begin (cont.)
Kohler Co. reserves the right to make revisions in the design of products without notice, as specified
in the Price Book.

Tools and Materials

For Standard and Remote Installations
Silicone Sealant
Additional Tools and Materials for Remote Installation
The following additional items are required if the blower motor is to be relocated from the standard position:
• Electrician pliers.
• Phillips screwdriver.
• Flat blade screwdriver.
• Adjustable end wrench.
• Drill and bits as required to install the blower mounting fasteners.
• 18 AWG non-metallic sheathed cable, two conductor with ground, with support clips, as required,
not provided.
• 4" (10.2 cm) x 2" (5 cm) electrical junction box with cover, gasket, and mounting screws, one (1)
each, not provided.
• Strain reliefs, three (3) total, one must fit the blower motor cover with standard NPT (National Pipe
Thread) threads, the other two are to fit the holes in the new junction box, not provided
• Wire connectors (wire nuts or equivalent), six (6) each, not provided.
• 1-1/2" (3.8 cm) PVC or other rigid pipe, with fittings, unions, PVC cement or equivalent fastening
method, and support clips, as required, not provided.
• Flathead wood screws, concrete anchors, or other fasteners for mounting the blower motor, four (4)
each, not provided.
• Solid copper 8 gauge bonding wire, 36" (91.4 cm).
Kohler Co.
Plus:
• Conventional woodworking tools and materials or
conventional masonry tools and materials, as
appropriate
• Drop cloth
• Construction Adhesive (optional)
• Cement or Mortar (optional)
• 2x4s or 2x6s (optional)
5
1035472-2-G

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-1158K-1168K-1173K-1174K-1375K-1418 ... Show all

Table of Contents