I. PRE-START-UP:
j
VERIFY THAT ALL PACKAGING MATERIALS HAVE BEEN REMOVED FROM UNIT
j
VERIFY INSTALLATION OF OUTDOOR AIR HOOD
j
VERIFY INSTALLATION OF FLUE EXHAUST AND INLET HOOD (48PG and PM ONLY)
j
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
j
VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT
j
VERIFY GAS PRESSURE TO UNIT GAS VALVE IS WITHIN SPECIFIED RANGE (48PG and PM ONLY)
j
CHECK GAS PIPING FOR LEAKS (48PG AND 48PM)
j
CHECK THAT INDOOR−AIR FILTERS ARE CLEAN AND IN PLACE
j
CHECK THAT OUTDOOR AIR INLET SCREENS ARE IN PLACE
j
VERIFY THAT UNIT IS LEVEL
j
CHECK FAN WHEELS AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND VERIFY SETSCREW IS TIGHT
j
VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED
j
VERIFY THAT SCROLL COMPRESSORS ARE ROTATING IN THE CORRECT DIRECTION
j
VERIFY INSTALLATION OF THERMOSTAT/SPACE SENSOR
j
VERIFY CONFIGURATION VALUES FOR ELECTRONIC CONTROLS (REFER TO CONTROL SET UP CHECKLIST)
j
VERIFY THAT CRANKCASE HEATERS HAVE BEEN ENERGIZED FOR AT LEAST 24 HOURS
II. START-UP
ELECTRICAL
TEMPERATURES
PRESSURES
j
VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS
GENERAL
j
ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS
S

UNIT START-UP CHECKLIST

______________
_______
S
SERIAL NO: _____________________________________
TECHNICIAN: ___________________________________
188

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents