Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
•
1. Filling the DHW cylinder......................................................................................................
•
•
2. Shutting down the system
•
•
3. Checking the safety valve function
•
•
4. Testing the anode earth current with an anode tester......................................................
•
•
5. Cleaning the inside of the DHW cylinder...........................................................................
•
•
6. Checking and replacing the protective magnesium anode (if required)......................... 11
•
•
7. Returning the DHW cylinder to use.................................................................................... 11
•
•
8. Checking the connections on the water side for tightness
•
9. Replacing the Vitosolic 100 or the SDIO/SM1A electronics module............................... 12