Final Shutdown; Shutting Down; Recommendations For Disassembly; Fluids To Be Recovered For Treatment - Carrier AquaForce PUREtec 30XWHPZE 301 Installation, Operation And Maintenance Instructions

Water-cooled liquid chillers and heat pump with r-1234ze(e) or optionally with r-515b refrigerant
Hide thumbs Also See for AquaForce PUREtec 30XWHPZE 301:
Table of Contents

Advertisement

13 - FINAL SHUTDOWN

13.1 - Shutting down

Separate the units from their energy sources, allow them to cool then drain them completely.

13.2 - Recommendations for disassembly

Use the original lifting equipment.
Sort the components according to their material for recycling or disposal, in accordance with regulations in force.
Check whether any part of the unit can be recycled for another purpose.

13.3 - Fluids to be recovered for treatment

- Refrigerant
- Heat-transfer fluid: depending on the installation, water, brine solution, etc.
- Compressor oil

13.4 - Materials to be recovered for recycling

- Steel
- Copper
- Aluminium
- Plastics
- Polyurethane foam (insulation)

13.5 - Waste Electrical and Electronic Equipment (WEEE)

At the end of its life, this equipment must be disassembled and contaminated fluids removed by professionals and processed via 
approved channels for waste electrical and electronic equipment (WEEE).
35

Advertisement

Table of Contents
loading

Table of Contents