Final operations
Remark
Final operations are not especially difficult.
They are carried out in reverse order to the preliminary
operations. However, during reassembly, the tight-
ening torques, settings and tests outlined below must
be carried out.
Tightening torque:
- as required, wheel screws or nuts (see chapter 6).
Topping-up:
- of coolant, to the maximum level marked on the
expansion tank (Fig. 29).
Tests:
- air conditioning system (if fitted) (see chapter 12),
- cab suspension (if fitted) (see chapter 12),
- all mechanical, hydraulic, electrical and electronic
functions concerned by servicing.
Check tightness:
- of hydraulic unions,
- of water hoses.
Massey Ferguson 6400 - Issue 2
¤
H
Splitting - Front frame / Perkins engine
Fig. 29
02A01.15