MASSEY FERGUSON 6400 Workshop Service Manual page 124

Table of Contents

Advertisement

Splitting - Perkins Engine / GBA20 Gearbox
Final operations
Remark
Final operations are not especially difficult.
They should be carried out in the reverse order to
preliminary operations. However, it will be necessary
during reassembly to carry out the tightening torques,
adjustments and tests described below.
Tightening torques
As required:
- front cab attachment screw (see chapter 12),
- screw (2) of the connector (1) on the main harness
(Perkins EEM engine) (Fig. 19 and Fig. 27) to a
torque of 2.82 to 3.15 Nm.
Topping-up:
- of coolant, to the maximum level marked on the radi-
ator and expansion tank (Fig. 28).
Tests:
- air conditioning system (if fitted) (see chapter 12),
- cab suspension (if fitted) (see chapter 12),
- all mechanical, hydraulic, electrical and electronic
functions concerned by servicing.
Check tightness:
- of hydraulic unions.
02B01.20
¤
H
Fig. 27
Fig. 28
Massey Ferguson 6400 - Issue 2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

644564556460646564706475 ... Show all

Table of Contents