Installation And Fixing Material; Unloading And Erecting The Transport Units; Packing And Transport Unit; Checking The Delivery For Completeness And Transport Damage - Siemens 8DA Installation Instructions Manual

Medium-voltage switchgear
Table of Contents

Advertisement

Packing
Transport unit
=USNJVOTPKV=G=fkpq^iiqflk=fkpqor`qflkp=Ua^=G=oÉîáëáçå=MP
• Shim plates 0.5 to 1 mm
• Cleaning agent HAKU 1025/90
• Soft, lint-free cloth
• Torx reversing ratchet / screwdriver T10/80, T20/100, T25/100, T30/115
• Water level
• Guide string
• Rod magnet with flexible shaft
• Open spanners SW 13, 16, 17 , 18, 19, 24, 27 , 32 , 36
• Ring spanners SW 13, 16, 17 , 18, 19, 22, 24, 27
• Various screwdrivers
• Vernier caliper
• Water pump pliers
• Mirror with flexible shaft (welding mirror)
5.6

Installation and fixing material

Before starting to install the individual components, provide for the required installation
and fixing material.
6

Unloading and erecting the transport units

6.1

Packing and transport unit

The transport units can be packed as follows:
• on pallets, covered with PE protection sheeting
• in a seaworthy crate (switchgear is sealed with desiccant bags in PE protection sheet-
ing)
• other packings in special cases.
NOTE!
The packing materials of 8DA switchgear can be disposed of as classified materials. Please observe the local
regulations for disposal and environmental protection.
Transport units consist of:
• Individual panels or panel groups consisting of up to 4 individual panels
• Accessories
6.2

Checking the delivery for completeness and transport damage

Before installation, the transport units must be checked for completeness and damage.
fåëí~ää~íáçå