DISTRIBUTION SYSTEMS - PRIMARY HYDRAULIC POWER SYSTEM
Power beyond - Install
Prior operation:
Power beyond - Remove (A.10.A)
1.
Locate the power beyond slice (2) onto the three tie
rods protruding from the remote valve and connect
the load sensing hose (1).
2.
Replace the retaining nuts (1) and torque in the
sequence as specified. Refer to Power beyond -
Torque (A.10.A)
87628084B 12/06/2009
A.10.A / 45
1
BAIL06CCM242ASA
2
BAIL06CCM051ASA