Component Back Installation - Peco PS5 Operator's Manual

Table of Contents

Advertisement

Component Back Installation

Once your Sprayer Pump & Power Sprayer Battery has been installed, install the aluminum Component Back (Item
#2) to the Chassis Body (Item #1).
First, locate all bolt holes on the edge of both parts and install (12) Small Tinnerman Clips (Item #4). See Figure A.
Next, align the Component Back to the Chassis Body by aligning the (2) bottom bolt holes to those on the Chassis
Body and securing the Component Back by using (2) #10-12 x 1/2" Tinnerman Screws (Item #5). See Figure A.
Finally, install (3) Grommets into the 1-1/8" Dia Holes located on the Front and Left side of the Chassis Body. See
Figure B.
Note: Some parts and part features have been hidden from view for visual clarity.
Figure A
Figure B
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

12008

Table of Contents