Prepare The Bath With Airjets - Kohler Bancroft Experience BubbleMassage K-1158-GCR Installation Manual

Bath with airjets
Hide thumbs Also See for Bancroft Experience BubbleMassage K-1158-GCR:
Table of Contents

Advertisement

Available languages

Available languages

3. Prepare the Bath with Airjets

For All Installations
Install the drain to the bath according to the drain manufacturer's instructions. Do not connect the
trap at this time.
Position a clean drop cloth or similar material in the bottom of the bath to protect the finish. Ensure
that the airjets are covered. Be careful not to scratch the surface of the bath.
Blower Motor Options
IMPORTANT! The following sections are applicable to either the standard blower installation or the
custom blower installation. Use the "Standard Installation" sections if the blower is to remain on the bath
support board. If the blower is to be relocated to a custom location, use the "Remote Blower Motor
Location" Sections.
Standard Installation Sections
Secure the Bath with Airjets to the Subfloor - Standard
Install the Plumbing - Standard
Make Power Connections - Standard
Test Run the Bath with Airjets - Standard
Then go to the "Complete the Finished Deck" section.
Remote Blower Motor Location Sections
Disconnect the Blower Motor - Remote
Secure the Bath with Airjets to the Subfloor - Remote
Mount the Blower Motor - Remote
Terminate the Cable at the Blower - Remote
Install the Power Cord at the Control - Remote
Install the Plumbing - Remote
Make Power Connections - Remote
Test Run the Bath with Airjets - Remote
Then go to the "Complete the Finished Deck" section.