Receiving and storage

Field receiving
Inspect the unit carefully for possible
freight damage. Should any damage
revealed, a report should be submitted
to the carrier for compensation. Check
the unit nameplate data with order
request form data and data on the
freight bill to assure the unit is "as
ordered".
To minimize loss of transmit damage,
please follow the inspection steps
hereafter one by one before signing on
the freight bill.
1.Inspect each component carefully.
Check the unit and cartons for any
visible scratch or damage.
2.Inspect the unit for any concealed
damage on arrival as soon as possible.
A report should be submitted within
fifteen days. Should any concealed
damage exist, stop unpacking the unit
and keep everything as they are at
the job site. Photos should be taken,
if possible, and evidence should be
provide by the clients on a damaged
unit before arrival.
3.Inform the final carrier of damage
situation by phone or mail. At the
presence of both the carrier and sales
personnel, check procedures should
be performed on to what extent the unit
is damaged.
4.Contact sales representative and ask
for repair. Service the unit only after
signature of the carrier on the damage
situation report.
N o t e T h e u n i t i s c h a r g e d w i t h
adequate refrigerant before ex-factory.
Pressure check should be done on unit
arrival with pressure gauge to assure
leak free during transmit. A service
valve hose is shipped in the unit shell
for this purpose. If no leakage found,
a indication of normal unit, remove the
hose and cap the service valve for seal
4
purpose, if else, a service should be on
the way.
Field storage
This unit is designed for indoor use.
Erosion due to bad weather will
damage the unit and provide the
opportunity for pollutant's emergence,
which the indoor air quality will suffer
from when unit placed outdoor. When
outdoor installment is the only option,
p r o t e c t i o n s h e r e a f t e r s h o u l d b e
provided.
1.Install the unit on or above a dry field
where air flows without obstruction.
2.Waterproof oilcloth should be used to
protection the unit from wind blowing
and rain falling on.
3.Methods should be taken to assure
continuous ventilation around the
unit in case of humidity attachment
on the unit surface. Wet insulation
layer is a perfect place for bacteria,
mould specially to grow, which is
acknowledged as a reason responsible
for odor diffusion and air quality loss.
4.Unit should be placed in a upright
position so as to remain oil in the
compressor.
5.Less than three horizontal units can
be tiled horizontally, which is not an
option for vertical units.
Warning
W e t i n s u l a t i o n l a y e r
inside the unit is a perfect place for
microbial(mould) growth which is
proven as responsible for indoor
odor diffusion and air quality loss
resulting directly health problem. If
any mould appears in the insulation
layer, remove and change that layer
prior to unit start or severe health
problems will be suffered from.