Maintenance Log - AAON RN Series Installation Operation & Maintenance

Packaged rooftop units, heat pumps, & outdoor air handling units
Table of Contents

Advertisement

Electric Preheating
Limit Lockout
Outside Air Temperature Setpoint ________°F
Preheat Leaving Air Temperature Setpoint ________°F
Stage
1
2
3
4

Maintenance Log

This log must be kept with the unit. It is the responsibility of the owner and/or maintenance/service
contractor to document any service, repair or adjustments. AAON Service and Warranty
Departments are available to advise and provide phone help for proper operation and replacement
parts. The responsibility for proper start-up, maintenance and servicing of the equipment falls to
the owner and qualified licensed technician.
Entry
Date
128
Amps
Action Taken
Aux. Limit Lockout
Stage
5
6
7
8
Amps
Name/Tel.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents