Cisco NCS 5700 Series Hardware Installation Manual page 82

Fixed-port routers
Table of Contents

Advertisement

Install and Remove QSFP-DD Transceiver Modules
Before you begin
You need these tools to install the transceiver modules:
• Wrist strap or other personal grounding device to prevent ESD occurrences.
• Antistatic mat or antistatic foam to set the transceiver on.
• Fiber-optic end-face cleaning tools and inspection equipment. See
Step 1
Attach an ESD wrist strap to yourself and a properly grounded point on the chassis or the rack.
Step 2
Remove the QSFP-DD transceiver module from its protective packaging.
Step 3
Check the label on the QSFP-DD transceiver module body to verify that you have the correct model for your network.
Do not remove the dust plug until you're ready to attach the network interface cable.
Note
Step 4
Hold the QSFP-DD transceiver module by the pull-tab.
Step 5
Align the QSFP-DD transceiver module in front of the module's transceiver socket opening and carefully slide the
transceiver into the socket until the transceiver contact with the socket electrical connector.
Figure 60: Inserting QSFP-DD Transceiver Module
Step 6
Holding the pull-tab, fully seat the transceiver in the module's transceiver socket until it clicks.
Hardware Installation Guide for Cisco NCS 5700 Series Fixed-Port Routers
76
for Fiber-Optic
Connections.
Connect Router to the Network
Inspection and Cleaning Procedures

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents