York YLUA0078 Installation Operation & Maintenance page 3

Air-cooled scroll condensing units
Table of Contents

Advertisement

FORM 150.73-NM1
ISSUE DATE: 09/04/2020
In complying with Johnson Controls' policy for con-
tinuous product improvement, the information con-
tained in this document is subject to change without
notice. Johnson Controls makes no commitment to
update or provide current information automatically
to the manual or product owner. Updated manuals, if
applicable, can be obtained by contacting the nearest
Johnson Controls Service office or accessing the John-
son Controls Knowledge Exchange website at
docs.johnsoncontrols.com/chillers/.
Revisions made to this document are indicated in the following table. These revisions are to technical information,
and any other changes in spelling, grammar, or formatting are not included.
AFFECTED PAGES
DESCRIPTION
3
Conditioned Based Maintenance program information added
18
Motor Current Module paragraph removed
85
Isolator locations updated in image and dimensions updated in table for YLUA0098 to YLUA0130
89
Isolator Locations section removed
MANUAL DESCRIPTION
Installation and Start-up Checklist
Limited Warranty Engineered Systems Equipment
Shipping Damage Claims
Traditional chiller maintenance is based upon assumed
and generalized conditions. In lieu of the traditional
maintenance program, a Johnson Controls YORK
Conditioned Based Maintenance (CBM) program can
be substituted. This CBM service plan is built around
the specific needs for the chiller, operating conditions,
and annualized impact realized by the chiller. Your lo-
cal Johnson Controls Branch can propose a customized
JOHNSON CONTROLS
CHANGEABILITY OF THIS DOCUMENT
https://
REVISION NOTES
ASSOCIATED LITERATURE
CONDITIONED BASED MAINTENANCE
It is the responsibility of rigging, lifting, and operating/
service personnel to verify the applicability of these
documents to the equipment. If there is any question
regarding the applicability of these documents, rig-
ging, lifting, and operating/service personnel should
verify whether the equipment has been modified and
if current literature is available from the owner of the
equipment prior to performing any work on the chiller.
Planned Service Agreement that leverages real time
and historical data, delivering performance reporting,
corrective actions required and data enabled guidance
for optimal operation and lifecycle assurance. The pro-
gram will include fault detection diagnostics, operation
code statistics, performance based algorithms and ad-
vance rules based rationale delivered by the Johnson
Controls Connected Equipment Portal.
FORM NUMBER
150.73-CL2
50.05-NM2
50.15-NM
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ylua0158

Table of Contents