Advertisement

Roof Terminated
Exhaust Pipe
Ventilation
Furnace
Louvers
(Crawl Space)
Coupling or
3 in. to 2 in.
Transition
(Field Provided)
* See Maximum Vent Lengths table
NOTE: The inlet and outlet air openings shall each have a free area
of at least one square inch per 4,000 Btu (645mm
hour of the total input of all equipment in the enclosure.
Figure 8. Equipment in Confined Space
(Inlet Air from Ventilated Crawl Space and Outlet Air
to Outside)
Figure 9. Equipment in Confined Space - All Air from
507271-02
Inlet Air
Minimum
12 in. (305mm)
above Crawl
Space Floor
*Intake Debris Screen Provided
per 1.17kW) per
2
Outside
Figure 10. Equipment in Confined Space - all Air from
Shipping Bolt Removal
Units with a 1/2 hp blower motors are equipped with three
flexible legs and one rigid leg. The rigid leg is equipped
with a shipping bolt and a flat white plastic washer (rather
than the rubber mounting grommet used with a flexible
mounting leg). See Figure 11. The bolt and washer must
be removed before the furnace is placed into operation.
After the bolt and washer have been removed, the rigid leg
will not touch the blower housing.

Installation

Setting Equipment
Do not install the furnace on its front, back or in the
horizontal position. See Figure 13. Do not connect the
return air ducts to the back of the furnace. Doing so
will adversely affect the operation of the safety control
devices, which could result in personal injury or death.
Issue 1917
Outside
Units with 1/2 HP Blower Motor
Figure 11.
WARNING