Lennox Allied Air A95DF1D Installation Instructions Manual page 20

Warm air gas furnace
Table of Contents

Advertisement

Intake Piping
This furnace may be installed in either direct vent or non-
direct vent applications. In non-direct vent applications,
when intake air will be drawn into the furnace from
the surrounding space, the indoor air quality must be
considered. Guidelines listed in Combustion, Dilution and
Ventilation Air section must be followed.
Follow the next two steps when installing the unit in Direct
Vent applications, where combustion air is taken from
outdoors and flue gases are discharged outdoors. The
provided air intake screen must not be used in direct vent
applications (outdoors).
1.
Use cement or a sheet metal screw to secure the
intake pipe to the inlet air connector.
2.
Route piping to outside of structure. Continue with
installation following instructions given in general
guide lines for piping terminations and intake and
exhaust piping terminations for direct vent sections.
Refer to Table 7A and Table 7B for pipe sizes.
Page 20 of 51
Figure 24. Typical Intake Pipe Connections (Direct Vent Applications)
Figure 25. Typical Air Intake Pipe Connections
Non-Direct Vent Applications
Issue 1917
507271-02