Installing A Secondary Full-Height Pci Riser Cage Option - HP HPE ProLiant DL365 Gen10 Plus Server User Manual

Hide thumbs Also See for HPE ProLiant DL365 Gen10 Plus Server:
Table of Contents

Advertisement

Installing a secondary full-height PCI riser cage option

Installing a secondary full-height PCI riser cage option
When installed, this riser cage supports full-height, 3/4-length expansion boards up to 9.5". PCIe3 slot 2 is no longer available.
Prerequisites
Prerequisites
This option requires a dual processor configuration.
Before installing this option, be sure you have the following:
The components included with the hardware option kit
Any expansion boards or controllers you plan to install
T-10 Torx screwdriver
T-15 Torx screwdriver
Procedure
Procedure
1. Power down the server (Power down the server).
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
a. Extend the server from the rack ( Extend the server from the rack ).
b. Remove the server from the rack ( Remove the server from the rack ).
4. Remove the access panel ( Remove the access panel ).
5. Remove the primary PCI riser cage ( Remove the primary PCI riser cage).
6. Use a T-10 Torx screwdriver to remove the slot 2 bracket from the primary riser cage.
7. If installed, remove the low-profile riser cage.
Installing a secondary full-height PCI riser cage option
98

Advertisement

Table of Contents
loading

Table of Contents