Siemens SIMOTICS FD 1MQ1 Operating And Installation Instructions page 7

Low-voltage motor
Hide thumbs Also See for SIMOTICS FD 1MQ1:
Table of Contents

Advertisement

6.3.1
Terminal box 1XB1621...........................................................................................................69
6.3.2
Terminal box 1XB1631...........................................................................................................69
6.3.3
Terminal box 1XB7730...........................................................................................................70
6.3.4
Terminal box 1XB7731...........................................................................................................71
6.3.5
Terminal box 1XB7740...........................................................................................................71
6.3.6
Terminal box 1XB7750...........................................................................................................72
6.3.7
Rotating the terminal box .......................................................................................................72
6.3.8
Mounting/removing the terminal box ......................................................................................75
6.4
Preparation.............................................................................................................................76
6.4.1
Terminal designation..............................................................................................................76
6.4.2
Selecting cables .....................................................................................................................76
6.4.3
Connecting the grounding conductor .....................................................................................77
6.4.4
Connect metal shield in the terminal box ..............................................................................78
6.4.5
Connection without terminal box ............................................................................................78
6.4.6
Connecting the machine for a specific direction of rotation....................................................79
6.4.7
Undrilled entry plate ...............................................................................................................79
6.5
Inserting and routing the cables .............................................................................................80
6.5.1
Bringing cables into the terminal box 1XB... with sealing insert with break-off ring ...............80
6.5.2
Bringing cables into the terminal box 1XB... with cable gland................................................82
6.5.3
Certified cable entries, thread adapters and sealing plugs ....................................................82
6.5.4
Laying cables .........................................................................................................................83
6.5.5
Connecting cables with cable lugs .........................................................................................83
6.5.6
Connecting cables without cable lugs ....................................................................................84
6.5.7
Use of aluminum conductors..................................................................................................86
6.5.8
Using single-stranded cables .................................................................................................87
6.5.9
Internal equipotential bonding ................................................................................................87
6.5.10
Stepless mating face for the seal in the terminal box cover ..................................................87
6.5.11
Minimum air clearances .........................................................................................................88
6.5.12
Finishing connection work......................................................................................................88
6.6
Connecting the auxiliary circuits.............................................................................................89
6.6.1
Selecting cables .....................................................................................................................89
6.6.2
Bringing cables into the auxiliary terminal box and routing them ...........................................89
6.6.3
Intrinsically safe circuits for sensors or probes ......................................................................90
6.6.4
Connect metal shield in the terminal box ..............................................................................90
6.6.5
Connecting an external fan motor ..........................................................................................90
6.6.6
Connecting temperature monitoring for the stator winding ....................................................91
6.6.7
Terminating the connection work (auxiliary circuit) ................................................................92
7
Start-up.......................................................................................................................................................93
7.1
Checks to be carried out prior to commissioning ..................................................................93
7.2
Converter operation ...............................................................................................................94
7.3
Measuring the insulation resistance before commissioning...................................................95
7.4
Greasing the roller bearings prior to commissioning..............................................................95
7.5
Setting the automatic regreasing system ...............................................................................96
7.6
Commissioning an external fan..............................................................................................97
7.7
Setpoint values for monitoring the bearing temperature ........................................................98
7.8
Set values for monitoring the winding temperature................................................................98
SIMOTICS FD 1MQ1
Operating Instructions 01/2019
Table of contents
7

Advertisement

Table of Contents
loading

Table of Contents