Ariens Sno-Thro 921023 – Deluxe 28 Track Owner's/Operator's Manual page 10

Deluxe series
Hide thumbs Also See for Sno-Thro 921023 – Deluxe 28 Track:
Table of Contents

Advertisement

INSTALL DISCHARGE CHUTE
AND DISCHARGE CHUTE CRANK
(Figures 5 and 6)
1. Grease underside of discharge chute
ring (if not already greased).
2. Remove mounting hardware from auger
housing (Figure 5).
3. Install discharge chute over opening in
the auger housing. Install J-clamp for
deflector cable onto top mounting bolt.
4. Install mounting hardware into housing
and finger tighten.
NOTICE: Leave discharge chute pedestal
loose to help install the chute crank.
2
4
6
1. Mounting Holes
2. Discharge Chute
3. Chute Pedestal
4. Discharge Chute Ring
5. Mounting Hardware
6. J-Clamp
5. Remove gear cover from top of chute
pedestal. (Figure 6).
6. Remove spring clip pin from pinion gear.
7. Insert the short end of the chute crank
into the hole in the front of the control
panel.
NOTICE: Be careful not to damage nylon
bushing when attaching crank to the control
panel.
Figure 5
8. Connect the chute crank to the pinion
gear on chute with spring clip pin
removed in step 6.
9. Reinstall gear cover to top of chute
pedestal.
.
2
1
1. Chute Crank
2. Control Panel
3. Spring Clip Pin
4. Gear Cover
3
10. Orient the chute and pedestal to its most
vertical position and tighten pedestal
hardware to 15 – 31 lbf-ft (20 – 42 N•m)
(Figure 5).
REMOTE DEFLECTOR CONTROL
(Figures 7 and 8)
5
.
3
1. Chute Deflector Cable
2. J-Clamp
3. Cable Guide Clip
EN - 10
1
Figure 6
1
2
2
Figure 7
4
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents