Wiring Diagram - Travis Industries 864 HH Owner's Manual

Operation maintenance
Hide thumbs Also See for 864 HH:
Table of Contents

Advertisement

22

Wiring Diagram

Millivolt Wiring
(for gas control valve)
120 Volt Wiring
Ground
Ground
(green)
(green)
Power In
Common
Common
Molex
(white)
(white)
Connector
Hot
Hot
(black)
(black)
Blower Snap Disk
Black
Black
Fireplace
Blower
Optional Snap Disk
Optional Regulator
Solenoid (24 V. DC)
Gas Control
Valve
(millivolt DC)
Caution:
Label all wires prior to disconnection when servicing controls. Wiring errors can cause
improper and dangerous operation.
© Travis Industries
Maintenance
Optional
Thermostat
Red
Ground
(attached to fireplace)
Green
Green
Optional
Power
Heat Duct
White
Molex
Connector
White
Black
Black
Fireplace
Rheostat
White
Black
Black
Black
Blue
Blue
Optional Remote
Control
Thermocouple
Brown
On/Off Switch
Copper Co-Axial
Wire
Red
White
Ground
Ground
(green)
(green)
Common
Common
(white)
(white)
Hot
Hot
(black)
(black)
Ground (green)
Common (white)
Hot (black)
3
6
1
8
2
Brown
Red
4080218
Piezo Igniter
Thermopile
Spark Electrode
Pilot Hood
Optional Power Heat Duct
Rheostat
Blower
Junction
Junction Box
Box
Ground
Ground
(green)
(green)
Common
Common
(white)
(white)
Hot
Hot
(black)
(black)
Heat Duct
Rheostat
Optional Second Heat
Duct (same rheostat and
blower wiring as above)
7
9
Remote
Control
Molex
4
Connector
11
5
1
2
4
3
5
7
6
8
10
9
11
12
100-01181_003
Orange
Grounded
to Blower
Heat Duct
Blower
9
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

864 hh fireplace

Table of Contents