Bradford White PV Series Service Manual page 41

Hide thumbs Also See for PV Series:
Table of Contents

Advertisement

PV Series
Installation of Inner Door With Gasket (cont.)
Step 10.
Firmly place right side inner door flange against the left side inner door flange and secure
with (2) ¼" hex drive screws from step 3b. DO NOT OVER TIGHTEN SCREWS.
Step 11.
Align right side inner door to combustion chamber and verify the fastener holes of the
combustion chamber are aligned with right side inner door slotted opening. Verify seal
integrity around combustion opening. Secure right side inner door using ¼" hex drive screws
from step 3a. DO NOT OVER TIGHTEN SCREWS. Verify both left and right sides of inner
door are properly positioned and sealed against the combustion chamber.
Step 12.
Replace outer jacket burner access door.
Step 13.
To resume operation follow the instructions located on the lighting instruction label or the lighting
instructions located in the installation and operation manual.
PV SERVICE PROCEDURE XIII
Inner Door/Gasket Removal, Inspection &
Replacement
41
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents