Bradford White PV Series Service Manual page 25

Hide thumbs Also See for PV Series:
Table of Contents

Advertisement

PV Series
Blower Temperature Switch
Replacement
Step 1. Position gas control power switch to
the "OFF" position and unplug heater
from wall outlet.
Step 2. Remove the three screws (Phillip's
screw driver) from the control access
cover on blower and remove cover
(see photo 16).
Step 3. Locate blower temperature switch
(see photo 17).
Step 4. Disconnect red and yellow wire leads
from switch.
Step 5. With an appropriate tool such as side
cutters, snip the retaining lug from the
blower housing to allow removal of
temperature switch (see photo 18).
Step 6. Remove switch from blower housing.
Step 7. Install new switch. Be sure switch is
properly seated in mounting area.
Step 8. Reconnect red and yellow wires to
new switch. Wires are
interchangeable with either terminal.
Step 9. Position gas control power switch to
the "ON" position and verify proper
heater operation.
Step 10. Replace control access cover from
step 2.
PV SERVICE PROCEDURE V
Blower Temperature Switch Testing &
Replacement
WARNING
115 volt potential exposure. Use
caution to avoid personal injury.
25
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents