Bradford White PV Series Service Manual page 23

Hide thumbs Also See for PV Series:
Table of Contents

Advertisement

PV Series
Blower Removal
Step 1. Position gas control power switch to "OFF" position and adjust control to
call for heat.
Step 2. Unplug blower power cord from wall
outlet.
Step 3. Disconnect vent system from exhaust
adapter on top of blower.
Step 4. Remove exhaust adapter from blower
(blade screw driver) and retain for use
on new blower.
Step 5. Unplug cord sets from blower.
Step 6. Remove the three blower mounting
screws (1/4" nut driver).
Step 7. Remove blower with gasket from
water heater.
Blower Installation
Step 8.
Clean any debris from jacket head
of water heater.
Step 9.
Set new blower with gasket in
place using locating pins on
blower flange to line up with
location holes in jacket head. Be
sure not to damage gasket.
Step 10. Secure blower in place using
mounting screws from step 6.
Step 11. Re-install exhaust adapter from
step 4.
Step 12. Reconnect vent system to exhaust
adapter.
Step 13. Reconnect cord sets from step 5.
Step 14. Plug blower power cord into wall
outlet.
Step 15. Position gas control power switch
to the "ON" position.
Step 16. Verify proper blower operation.
PV SERVICE PROCEDURE IV
Blower testing & Replacement
23
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents