Bradford White PV Series Service Manual page 40

Hide thumbs Also See for PV Series:
Table of Contents

Advertisement

PV Series
Installation of Inner Door With Gasket
Step 7.
Clean any residual gasket residue or other debris from
combustion chamber surface before installing the inner
door/gasket assembly.
Step 8.
Place the left side inner door into position first. Firmly
position the radiused channel of the inner door around
the feedline. Using the ¼" hex drive screws from step
3c, secure left side inner door in place. DO NOT
OVER TIGHTEN SCREWS
Step 9.
Position pilot tube and igniter/sensor wire against left
side inner door flange gasket. DO NOT ROUTE
THROUGH RADIUSED CHANNEL WITH FEEDLINE.
40
40
PV SERVICE PROCEDURE XIII
Inner Door/Gasket Removal, Inspection &
Replacement
Stripped fastener connections
may allow for seal breach of
inner door. A seal breach may
result in a fire or explosion
causing property damage,
personal injury or death. Do
not over tighten screws in
WARNING
steps 8, 10 and 11.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents