Operation Flow; Power On And Start The System - JRC JMA-9123-7XA Instruction Manual

Marine radar equipment
Hide thumbs Also See for JMA-9123-7XA:
Table of Contents

Advertisement

3.1

OPERATION FLOW

• Do not put anything on the operation panel.
• Do not give any impact to the operation panel,
Each operation is described in detail below.
JMA-9100 Instruction Manual
Attention
If you put anything hot on it, it may be deformed.
trackball, or controls.
Otherwise, any failure or damage may result.
POWER ON AND
START THE SYSTEM
OBSERVE AND
ADJUST VIDEO
ACQUIRE AND
MEASURE DATA
END THE OPERATION
AND STOP THE SYSTEM
3- 1
>
>
3.BASIC OPERATION

3.1 OPERATION FLOW

3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents