Trane CGWF SE Installation Operation & Maintenance page 38

Indoor water-cooled chillers and water/water heat pumps with scroll compressors and symbio 800 controller
Table of Contents

Advertisement

7.6 CUSTOMER PLANT SKETCHES
7.6.1 Customer plant sketch on the condenser side of CGWF SE / CGWF HE / CXWF units
with no on board unit pump
MODULATING
2 WAY VALVE
(OPTIONAL)
2-ways
valve
modulating
signal
0-10V from
the unit
electrical
cabinet
P1
Primary Pump
P2
Secondary Pump
ST
Temperature Probe
FL
Flow Switch
SC
Drainage
SF
Vent Valve
ET
Expansion Vessel
GR
Filling group
F
Steel Mesh Strainer
VR
Check Valve
SV
Safety Valve
RB
Interception valve
Figure 23
IMPORTANT: the steel mesh strainer in the customer plant is obligatory in order
to keep the warranty, the flow switch is optional
Page 39
MODULATING
3 WAY VALVE
(OPTIONAL)
3-ways
valve
modulating
signal
0-10V from
the unit
electrical
cabinet
IMPORTANT The installation of the
modulating valve is at customer care
AIR CONDITIONING
WATER PUMP
HOT WATER
TANK (OR
ALTERNATIVELY
SOURCE)
FANCOIL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgwf heCxwf

Table of Contents