Switching The Storage Subsystem On/Off - Fujitsu ETERNUS JX40 S2 Operating Manual

Storage subsystem
Table of Contents

Advertisement

Installation
Switching the Subsystem ON/OFF
Ê Route the cables as described in the Technical Manual of the
PRIMECENTER Rack.
3.4

Switching the Storage Subsystem ON/OFF

The ETERNUS JX40 S2 PSUs have power switches. Automatic power on via
SAS Link can only be used if the PSU power switches are set to ON.
Operating Manual
31
ETERNUS JX40 S2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents