Installation Room Requirements - Viessmann Vitocal 300-G Pro SPS Installation And Service Instructions For Contractors

Table of Contents

Advertisement

Preparing for installation
Delivery and siting
Handling by forklift truck or pallet truck
Fig.2
Select a fork length in line with the heat pump
A
length; see "Specification" (page 93).
Centre of gravity of the Vitocal 300-G Pro/
B
Vitocal 300-W Pro (at the rear at the hydraulic con-
nections)
Edge protection (e.g. 2 or 3 layers of corrugated
C
cardboard)
Siting

Installation room requirements

!
Please note
The installation room must be dry and free from
the risk of frost.
Ensure ambient temperatures between 0 and
35 °C.
!
Please note
Avoid risks of explosion due to dust, gases and
vapours
in the installation room.
10
(cont.)
!
Please note
Observe the permissible floor load.
Total weight, type BW 301.BS090 to
BW 302.BS250:
BW 301.BS090 740 kg
BW 301.BS120 840 kg
BW 302.BS090 745 kg
BW 302.BS120 850 kg
BW 302.BS150 1190 kg
BW 302.BS180 1260 kg
BW 302.BS250 1375 kg
Total weight, type WW 301.BS125 to
WW 302.BS300:
WW 301.BS125 1040 kg
WW 301.BS155 1050 kg
WW 302.BS125 1075 kg
WW 302.BS155 1085 kg
WW 302.BS200 1360 kg
WW 302.BS250 1405 kg
WW 302.BS300 1445 kg

Advertisement

Table of Contents
loading

Table of Contents