Installation Of Optional Modules; 1: N-Cac-5X Class A Converter Module; Installation - Honeywell Notifier RP-2001 Instruction Manual

Pre-action/deluge control panel
Table of Contents

Advertisement

Installation of Optional Modules

2.6 Installation of Optional Modules
CAUTION:
!
REMOVE ALL POWER (AC AND DC) BEFORE INSTALLING OR REMOVING MODULES OR
WIRING.
2.6.1 N-CAC-5X Class A Converter Module

Installation

The N-CAC-5X Module can be used to convert five Style B (Class B) Initiating Device Circuits to
Style D (Class A) and the two Style Y (Class B) Notification Appliance Circuits to Style Z (Class
A). Two N-CAC-5X Modules are required to convert all Output Circuits and/or Initiating Device
Circuits to Class A. The modules plug into connector J2 which is located at the top left of the main
circuit board and J7 which is located at the top center of the main circuit board.
To install the N-CAC-5X, remove the two main circuit board mounting screws referenced in the
following illustration and replace with the two supplied male/female standoffs in the locations
indicated in the following figure. Carefully align the connector on the N-CAC-5X with J2 on the
FACP main circuit board and press the module securely into place. Make certain the pins are
properly aligned to prevent bending or breaking of any connector pins. Secure the N-CAC-5X to
the standoffs with the screws that were just removed.
To install the second N-CAC-5X on J7, remove the main circuit board mounting screw referenced
in the following illustration and replace with the supplied male/female standoff. Insert the supplied
plastic standoff in the location indicated in the following illustration. Carefully align the connector
on the N-CAC-5X with J7 and press the module securely into place. Make certain the pins are
properly aligned to prevent bending or breaking of any connector pins. Secure the N-CAC-5X to
the metal standoff with the screw that was just removed.
Installation on J2 Connector
N-CAC-5X Module
Metal
Standoff
RP-2001 Series Manual — P/N 52985:D5 1/26/2017
REMOVE ALL SOURCES OF POWER
Metal
Standoff
Main Circuit Board
Figure 2.11 N-CAC-5X Module Installation
Installation on J7 Connector
N-CAC-5X Module
Plastic
Standoff
Installation
Metal
Standoff
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Notifier rp-2001eNotifier rp-2001c

Table of Contents