Link/ ACT
PoE
Note: The SFP ports are shared with normal RJ-45 ports 1,2,3 and 4. The RJ-45 can not be used
when SFP port link up.
2.4 Rear Panel
The 3-pronged power plug is placed at the rear panel of the switch right side shown as below.
2.5 Hardware Installation
Set the switch on a large flat space with a power socket close by. The flat space should be clean,
smooth, level and sturdy. Make sure there is enough clearance around the switch to allow
attachment of cables, power cord and allow air circulation. The last, use twisted pair cable to
connect this switch to your PC then user could start to operate the switch.
Off
Disconnect to Power Source
Blink
Reset button for 3 seconds
On
Flashing
Off
On
Port is linked to Power Device
Off
No Power Device is connected
6
Link
Data activating
No device is attached
ES1645-51