Husqvarna PG 530 Workshop Manual page 30

Hide thumbs Also See for PG 530:
Table of Contents

Advertisement

13
28
Setting up a new belt
Sealing the inspection/service holes
When fitting on the last inspection and service holes, be sure to seal everything up
properly with a silicone seal compound. Smoothing excessive silicone will make it
easier to clean and inspect the machine.
×2 10mm
SEALING THE INSPECTION HOLES
1. Smooth the main seal all around the
machine. Spread the sicaflex evenly
rather than removing any excess.
2. Apply silicone seal compound around
the belt tensioning hole.
3. Fit on the belt tensioner seal, aligning
the bolt holes.
• Then fit on the belt tensioner cover
plate, also aligning the holes.
4. Insert and tighten the three cover plate
screws.
• Then fit in and tighten the last exteri-
or bolt with washer.
×3 10mm
5. Apply silicone seal compound around
the belt inspection hole.
6. Fit on the belt inspection seal plate,
aligning the bolt holes.
• Then fit on the belt inspection cover
plate, also aligning the holes.
18mm
• Fit in and tighten the two cover plate
bolts.
LUBRICATING THE SHAFTS
7. Apply lubricant oil to the three fly pul-
ley shafts and run the machine on a low
speed to expel any excess silicone from
the oil seal.

Advertisement

Table of Contents
loading

Table of Contents