Pre-Work Preparations - Fujitsu PRIMERGY PG-R1CK20 User Manual

Tx200 s3 rack conversion kit
Table of Contents

Advertisement

2.2

Pre-work preparations

CAUTION
1
Complete the "A Product information sheet" ( pg.52).
2
Copy the information on "Product ID and manufactures number
label" attached to the server to the supplied blank label.
3
Shut down the system after checking the server system operation.
Make sure that the system is operating properly before performing the conversion to
rackmount type.
4
Turn off the server and disconnect the power cable from the
server.
5
If any peripherals are connected to the server, turn off all
peripherals and disconnect them.
CAUTION
34
• For safety reasons, make sure the server is located on a stable and level surface
when performing the conversion as the combined weight can be 40kg.
• Also, work in an open space as the rackmount must be laid horizontally to
perform the conversion.
Product ID
Manufactures
number
* "X" indicates A to Z or 0 to 9
• Devices inside the server remain hot after shutdown. Wait for approximately 10
minutes after shutdown before installing or removing hardware options from the
server.
PG XXXXXX
S/N
ST XXX A XXXXX
Copy the information
in this blank label

Advertisement

Table of Contents
loading

Table of Contents