Electrical Installation - Siemens SINAMICS G120P Operating Instructions Manual

Line reactors for power modules pm330
Hide thumbs Also See for SINAMICS G120P:

Advertisement

Electrical installation

Connection
When connecting the line filter and line reactor, you must take into account the following
conditions to ensure that they function correctly:
● Control cables must be routed separately from power cables. Power cables are motor
cables or connecting cables from the DC link of the Power Module (terminals DCP/DCN)
to other components (e.g., Braking Module). In particular, you must ensure that control
cables and power cables are not routed in parallel in a joint cable raceway, even if all the
cables are shielded.
Connection overview
Image 4-1
Tightening torques for screw connections
The following tightening torques apply when tightening current-conducting connections (DC
link connections, motor connections, busbars, cable lugs) and other connections (ground
connections, protective ground connections, steel threaded connections/glands).
Table 4- 1
Line reactors
Operating Instructions, 04/2016, A5E32845290B AC
Connecting the line filter, line reactor, and Power Module
Tightening torques for screw connections
Thread
Ground connections, protective
ground connections, steel threaded
M8
M10
M12
connections/glands
25 Nm
50 Nm
88 Nm
Aluminum threaded connec-
tions/glands, plastic, busbars,
cable lugs
13 Nm
25 Nm
50 Nm
4
13