UTICA BOILERS UCS-380 Installation, Operation & Maintenance Manual page 30

Condensing gas fired floor or wall mounted boiler
Table of Contents

Advertisement

FIGURE 6-20 Flue on Roof, Indoor Combustion Air
Vent
Combustion
Air
FIGURE 6-21 Flue on Sidewall, Inside Combustion Air
Combustion
Air
6 - COMBUSTION AIR AND VENT PIPING
Maintain 12"(305mm) US
(18"(457mm) Canada)
minimum clearance above
highest anticipated snow level
maximum 24" (610mm) above
roof
24" (610mm)
* Minimum Length
18" Vertical
Clearance to
ventilated soffit
T Vent
Maintain
12"(305mm) US
(18"(457mm)
Canada) clearance
above highest
anticipated snow
line
Snow line
Ground Level
Combustion air and Vent Piping Length Page 25.
Configurations of single pipe vent with flue on
sidewall, requires tee as vent terminal. See figures
6-19 and 6-21.
Combustion air and Vent Piping Length Page 25.
30
NOTICE
P/N 240011662, Rev. D [06/30/2017]

Advertisement

Table of Contents
loading

Table of Contents