Section 5: Operations; Installing Drill Bits - Grizzly T32540 Owner's Manual

Dual-spindle doweling jointer
Table of Contents

Advertisement

SECTION 5: OPERATIONS

To reduce your risk
of serious injury, read
this
BEFORE using tool.
Eye injuries, respiratory problems,
or hearing loss can occur while
operating this tool. Wear person-
al protective equipment to reduce
your risk from these hazards.
To reduce risk of injury, always dis-
connect power from jointer before
changing drill bits. Since bits are
sharp, use extra care and wear
gloves when installing them.
If you are not experienced with
this type of tool, We strongly rec-
ommend that you seek additional
training outside of this manual.
Regardless of the content in this
section, Grizzly Industrial will not
be held liable for accidents caused
by lack of training.
Model T32540 (Mfd. Since 10/20)
entire
manual

Installing Drill Bits

The Model T32540 will support 6–12mm
(
"–
") drill bits.
1
7
4
16
To install drill bits:
1. DISCONNECT TOOL FROM POWER!
2. Rotate drill bit holder until set screw is
visible (see Figure 8).
Set Screws
Figure 8. Drill bit holder set screws.
3. Loosen set screw, remove dull bit (if
installed), and insert sharp drill bit into
bit holder.
4. Rotate bit so flat section of shank
aligns with set screw, then tighten set
screw.
5. Verify drill bit is secure by attempting to
pull it out by hand.
6. Repeat Steps 2–5 for second drill bit.
Drill Bit
Holder
(1 of 2)
-15
-

Advertisement

Table of Contents
loading

Table of Contents