Cable routing for connection to the line supply
1. Feed the infeed cable into the cabinet from the bottom.
2. Connect the PE cable to the grounding bar.
3. Feed the cable up through the cabinet to terminal block -X1.
4. Secure the cable at suitable points.
5. Connect the cable to the terminal block.
Cabinet Modules NEMA
Manual, 04/2014, A5E03586450A
FL
Frame size:
GL
Electrical installation
4.5 Connections
JL
105