Preparing The Installation Area - LG MULTI F Installation Manual

Ceiling cassette indoor unit
Hide thumbs Also See for MULTI F:
Table of Contents

Advertisement

F
MULTI
F
MULTI
MAX

Preparing the Installation Area

1. Cassette indoor units include installation guides (templates) that depict the exact dimensions necessary for the ceiling opening. One is
a paper template that is found in the cassette indoor unit shipping materials; the other template is the cardboard on the bottom of the
packaging.
2. Using one of the templates, choose the location for the indoor unit. Mark where the four (4) suspension / hanger bolts, refrigerant piping,
and drain hose should be. Suspension bolt angle must account for drain direction.
3. Drill holes for the four (4) suspension / hanger bolts.
Figure 9: Cassette Indoor Unit Templates.
WARNING
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Preparing the Installation Area
Figure 10: Drilling Holes Using Template.
Ceiling
Figure 11: Ceiling Opening Dimensions and Bolt Locations.
23-1/16 inches ~ 26 inches (Ceiling Opening)
20-3/8 inches
18-5/32 inches
INSTALLATION
Level
Ceiling
22-15/32 i n ches
Uni t Si z e
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Multi f maxLmcn078hvLcn098hv4Lcn128hv4Lcn188hv4

Table of Contents