Installation; Package Contents - GRASS VALLEY NV9000 User Manual

Table of Contents

Advertisement

Chapter 3 provides installation and connection instructions.
Summary
Package Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Installing Software and Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Initialization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Package Contents

If you have ordered one or more NV9616 or NV9608 control panels from Grass Valley,
inspect the shipping container for damage. If you find any container damage, unpack and
inspect the contents. If the contents are damaged, notify the carrier immediately.
As you unpack the shipping container, look for the packing slip and compare it against the
contents to verify that you received everything as ordered. If anything is missing (or if you
find equipment damage unrelated to shipping), please contact technical support.
Depending on your order, the items that can ship include:
• One or more NV9616 or NV9608 control panels.
• An AC power cord.
The package does not contain network cables, serial cables, or mounting screws.
You do not need to take any special precautions regarding ESD.
This document does not address the shipment or installation of any other equipment or
software that can be used in conjunction with the NV9616 (including any system
controllers, other NV96xx control panels, EC9700 GUI, EC9710 GUI, and configuration
programs such as UniConfig, MRC, or NV9000-SE Utilities).
This document does briefly address the use of NV9000-SE Utilities and the Panel IP
Configuration Utility as they pertain to panel configuration.

Installation

Follow these steps to install a NV9616 or NV9608 control panel:
1 Mount, and secure, the panel in the rack.
The NV9616 and NV9608 are designed to mount in a 19© rack. Rack-mounting is not a
requirement.

Installation

9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nv9608Nv9616

Table of Contents