Installation; Package Contents - GRASS VALLEY NV9680 User Manual

Gv orbit / gv convergent control panel
Table of Contents

Advertisement

Chapter 3 provides installation and connection instructions.
Summary

Package Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Networking Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Initialization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Package Contents
If you have ordered one or more NV9680 control panels from Grass Valley, inspect the
shipping container for damage. If you find any container damage, unpack and inspect the
contents. If the contents are damaged, notify the carrier immediately.
As you unpack the shipping container, look for the packing slip and compare it against the
contents to verify that you received everything as ordered. If anything is missing (or if you
find equipment damage unrelated to shipping), please contact technical support. See
Grass Valley Technical
Depending on your order, the NV9680 items that can ship include:
• One or more NV9680 control panels.
• One or two power supplies for each NV9680, with straps that secure the AC power cords to
the power supplies.
• Optional WC0053 breakout cable.
The package does not contain network cables, serial cables, or mounting screws.
You do not need to take any special precautions regarding ESD.
Installation
Follow these steps to install a NV9680 control panel:
1 Mount, and secure, the panel in the rack.
The NV9680 is designed to mount in a 19" rack. Rack-mounting is not a requirement.
Place the panel in position in your rack. Attach the panel to the rack frame, using screws
appropriate for your rack. The panel's mounting slots are spaced 3.00 (76.2mm)
vertically and allow approximately 1/8" (3 mm) of movement horizontally.
2 We assume that you have an Ethernet switch connected to the GV-Orbit Server's
MANAGEMENT network. Connect an Ethernet cable from that switch to the RJ-45 port
at the rear of the NV9680.
Support, on page 33.
3
I nstallation
9

Advertisement

Table of Contents
loading

Table of Contents