Rinnai RSEP1S25P Installation And Operation Manual page 22

Super high-efficency (se+) series infrared gas heater
Table of Contents

Advertisement

903000009: Stainless Steel Ceiling Mount Kit for Patio Heaters
Component Quantities and Material Specifications each Kit:
2 x Ceiling Bracket - 12 ga. [0.102"] 316 S/S
2 x 24" [610 MM] Channel Leg - 12 ga. [0.102"] 316 S/S
2 x Heater Attachment Bracket - 12 ga. [0.102"] 316 S/S
12 x ¼" x ¾" Stainless Steel Bolts
12 x ¼" Stainless Steel KEP Nuts
[lock washer attached]
Note: It is the installer's responsibility to ensure:
Adequate mounting strength and integrity
to the structure using field supplied 3/8" lag
screws or bolts
Maintain required clearances to combustibles
from heater
Refer to manual: heater weights; required
clearances
Assembly: (Fig 8)
The 24" [610 mm] Channel Leg can be cut
to a shorter length
Ensure required clearances to combustibles
from heater are maintained
Fasten the Ceiling Bracket and Heater Attachment Bracket to the Channel Leg using two
supplied ¼" bolts at each connection as illustrated.
The arc of holes in the Ceiling Bracket allows angling of the Channel Leg from the bracket
up to 45°, and/or mounting the bracket to a sloped ceiling.
The arc of holes in the Heater Attachment Bracket allows angle mount of the heater.
NOTE: Maximum allowed heater angle is 30°
Fasten an assembled mounting bracket to each end of the Heater Support Bracket
[supplied on heater] using two ¼" bolts supplied.
Note:
The Ceiling and Heater Attachment Brackets
can be fitted directly to one another (Fig 9)
without the Channel Leg, and yet achieve mini-
mum clearance of 5-1/2" [140 mm].
Discard the Channel Legs.
SE+ Series Infrared Gas Heater Installation and Operation Manual
Figure 9: CEILING MOUNT
22
Figure 8: CEILING
MOUNT KIT
KIT - No Channel

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rsep1s25nRsep1s35pRsep1s35nRsep2s50n

Table of Contents