Roll Over Protective Structure (Rops) Frame - Check - New Holland Workmaster 25 Tier 4B Operator's Manual

Compact tractor (final)
Table of Contents

Advertisement

Roll Over Protective Structure (ROPS) frame - Check

Maintenance and inspection
1. Check the torque of the ROPS bottom portion mounting
bolts, (1). Tighten the M14, bolts to the correct torque
of 147 N·m (108 lb ft) if necessary.
2. Check the torque of the Roll Over Protective Structure
(ROPS) cross brace mounting bolts (2). Tighten the
M10 bolts to the correct torque of 60 N·m (41 lb ft) if
necessary.
3. Check the torque of the ROPS top portion mounting
bolts (3). Tighten the M12, bolts to the correct torque
of 83 N·m (61 lb ft) if necessary.
4. Inspect the operator's seat and the mounting parts for
the seat belt. Tighten the bolts (4) to the correct torque
of 28 N·m (21 lb ft) if necessary and replace any parts
that show wear or damage.
7 - MAINTENANCE
7-18
1
230100876
2
NHIL12CT00838AA

Advertisement

Table of Contents
loading

Table of Contents