Operation; Start Up - BenQ PB2120 User Manual

Benq pb2120: users manual
Hide thumbs Also See for PB2120:
Table of Contents

Advertisement

Operation

Start Up

1.
Plug the power cord into a wall socket.
2.
Press and hold POWER for 1 second.
The back-lit POWER key blinks green and stays green when the power is turned on.
When the power is turned off, there is a 90-second cooling period before the projector can be
re-started.
3.
Switch on all connected equipment.
Operation
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pb2220

Table of Contents