3.3.4 Lifting of delivery sections with crane lugs

The load carrying equipment must not run over the operating side of the AHU, but it must run
-
over the opening or the front side of the AHU (Figure 16).
The force effect has to take place uniformly across all four crane lugs of a delivery section.
-
After the pre-positioning of the delivery section at the desired position, remove the lifting lugs
-
and use them for the next delivery section.
Figure 15: Base frame height
Base frame height H [mm]
80
100
150
200
Table 2: Anzugsdrehmoment für Schrauben
Base frame height
Screw type
M8x20
M8x20
M12x30
M12x30
Nm
10
10
30
30