Installation - Mechanical; Lifting And Rigging; Remove Shipping Tie-Downs - Trane Performance Climate Changer UCCA Series Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

Installation - Mechanical

Lifting and Rigging

Remove Shipping Tie-Downs

Prior to unit placement, remove the shipping tie-downs. See
Figure 5
thru
Figure
10.
Horizontal FC Fan 3 to 10
1. Remove screws attaching shipping protection brackets
from floor.
Figure 5.
Shipping tie-down removal for horizontal FC
fan 3 to 10 - remove screws
Detail A
2. Remove shipping protection brackets through the door.
Figure 6.
Shipping tie-down removal for horizontal FC
fan 3 to 10 - remove bracket
CLCH-SVX009L-EN
Vertical FC Fan 3 to 10
1. Remove screws attaching shipping protection brackets
from center of isolation base to casing mounting bracket.
Figure 7.
Detail A
See Detail A
2. Remove shipping protection brackets through door.
Figure 8.
Shipping tie-down removal for vertical FC fan
3 to 10 - remove screws
See Detail A
Shipping tie-down removal for vertical FC
fan 3 to 10 - remove brackets
21

Advertisement

Table of Contents
loading

Table of Contents