Verifying Correct Operation Of The Indoor Unit; Table 2-4. Indoor Unit Leds - Alvarion BreezeNET DS.11 User Manual

Breezenet ds.11 series
Hide thumbs Also See for BreezeNET DS.11:
Table of Contents

Advertisement

Installation

2.8.2 Verifying Correct Operation of the Indoor Unit

To verify proper operation, view the LED indicators located on the front panel of
the outdoor unit as shown in Figure 2-8, and as described in Table 2-4.
Name
POWER
LINK
User's Guide

Table 2-4. Indoor Unit LEDs

Description
Power indication
Self Test and Remote
Ethernet Link
indication
Functionality
Green - 48VDC is present on the Radio
RJ45 port.
Off - No power is supplied to the Radio
RJ45 port.
Off – No Ethernet connectivity has been
detected between the outdoor unit and the
device connected to the indoor unit.
Orange– Self-test passed and Ethernet
connection is confirmed by the Outdoor
unit (Ethernet integrity check passed).
Note: The LINK LED indicates end-to-
end connection between the
outdoor unit and the Ethernet
connection to the indoor unit.
2-20
BreezeNET BU-DS.11/RB-DS.11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Breezenet rb-ds.11Breezenet bu-ds.11

Table of Contents