EVERY CALL ACTIVITIES
Purpose
List service activities required on every service call.
PROCEDURE
•
Perform GP 6.10 Internal Inspection.
•
Perform GP 6.11 External Cleaning.
•
Perform GP 6.12 Internal Cleaning
•
Perform GP 6.13 Base Cleaning
•
Perform GP 6.15 Optical Sensor Cleaning
Service Call Procedures
SCHEDULED MAINTENANCE
PROCEDURE
•
Check the number of Bind Cycles and Sheet Cycles in the eWire
Settings. Refer to GP 6.2.7.
•
Refer to the eWire Maintenance Schedule on Page 1-5. Perform all
scheduled maintenance.
•
Replace wear components as indicated in the Periodic Maintenance
section of this document.
09/16/2016
1-4
GBC eWire