Daikin UWL-B5 Series Catalogue/Engineering Data page 18

Water source modular chiller (heat pump)
Table of Contents

Advertisement

Installation Dimensions and Environment Limits
Machine Installation Space
Units must be installed by DAIKIN service staff or by specially trained personnel.
Units must installed by following relevant national and local electric, building and environment protection
standards as well as the installation manual.
Assembling Unit Modules
UNIT:mm
FOUNDATION BOLT
M12X200
UNIT:mm
Note:
1.
The groundwork must be a concrete floor or a V-iron structure that is strong enough to bear the
operation pressure of the unit.
2.
The groundwork must have draining facilities to discharge condensate water and defrosting water.
3.
Installation on roof, strength of building must be checked and drainage measures must be adopted.
4.
Each unit must be fixed by 4 M12x220 bolts;
5.
4 rubber cushions of 20mm thick must be installed between the unit and the groundwork.
6.
N represents the number of modules installed.
FOUNDATION BOLT
M12X200
FOUNDATION BOLT
M12X200
UNIT:mm
FOUNDATION BOLT
UNIT
M12X200
INSTALLATION
UNIT
POSITION
INSTALLATION
INSTALLATION
UNIT
POSITION
POSITION
UNIT
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uwl030b5Uwl040b5

Table of Contents