Management Port; Leds - Fluke OptiView T1/E1 Getting Started Manual

Wan analyzers
Table of Contents

Advertisement

OptiView
Getting Started Guide

MANAGEMENT Port

The
MANAGEMENT
port, which is located on the analyzer's front panel, is an Ethernet RJ-
45 connector that accepts 10BASE-T/100BASE-TX twisted-pair copper
cable.

LEDs

The OptiView WAN Analyzer has four LED
following conditions:
MGMT LINK
Indicates that a link has been established (lights solid green) on the
Ethernet
flashes green.
PWR
Indicates whether the analyzer is off or on (lights blue).
DTE
Indicate the status of the signal detected by each receiver:
12
port is the analyzer's remote control interface. This
(
MANAGEMENT
MANAGEMENT
(Power)
(one for each signal: outbound and inbound)
and
DCE
Green indicates that both a proper signal level and framing are
being detected at the input.
Red indicates that no signal is being detected at the input.
Yellow indicates that a proper signal level is being detected, but
no framing is being detected at the input.
"Yellow" status does not apply to a Serial or HSSI
interface. In addition, the signal LEDs do not indicate
signal status until the interface is configured. To
configure the interface type, see "Specifying the WAN
Interface and Physical Layer Parameters", later in this
guide.
. These LEDs indicate the
S
port link)
port. If there is activity on the link, the LED
Note

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optiview ds3/e3

Table of Contents