Kohler K-6918 Installation And Care Manual page 9

Wall-hung toilet
Table of Contents

Advertisement

Available languages

Available languages

Retainer
3/8" (10 mm)
Hex Shaft
6. Install the Wall Kit
Thread the notched pegs onto the threaded rods, leaving a 3/8"
(10 mm) gap on the rods.
Position the pegs with the notches facing down.
Insert the hex shaft into the receiver, then position the assembly
into the underside of the bowl and align with the holes in the
back of the bowl.
Install the retainer into the holes on the back of the toilet bowl,
and snap into the end of the receiver.
Kohler Co.
9
1287824-2-A

Advertisement

Table of Contents
loading

Table of Contents