Tools and Materials Thank You For Choosing Kohler Company We appreciate your commitment to Kohler quality. Please take a few minutes to review this manual before you start installation. If you encounter any installation or performance problems, please don’t hesitate to contact us.
Page 3
Cut out the template where indicated for the wall line. Position the template on the floor to ensure the template against the wall. Trace around the bowl outline on the floor with a pencil. Mark the mounting hole centerline on the floor. Kohler Co. 1066117-X2-B...
Page 4
Install the washer over the bracket and insert the hexagon screw into the bracket through the washer then tighten the screw. Ensure the bowl hole align to the brackets then remove the bowl from install area. 1066117-X2-B Kohler Co.
Page 5
Assemble the washers and rubber washers to the bolts. Securely tighten the bolts so the tank is level. Be sure the nuts are tight enough to achieve a watertight seal. Kohler Co. 1066117-X2-B...
Page 6
Water Supply Hose 5. Connect the Supply Hose Connect the water supply hose to toilet supply shank for inlet. Roughing-in of Waste Pipe (cm) Model K-17640 18.5 25.4 K-11494 18.5 25.4 Connector to Floor Connector to Wall 6. Define the Position of Connector Put the connector on the bowl, position between outlet and waste pipe.
Page 7
Hole Sleeve Screw 7. Install the New Toilet CAUTION: Risk of product damage. Overtightening may cause breakage or chipping of the vitreous china. Install the sleeves and tighten the screws. Attach the caps. Kohler Co. 1066117-X2-B...
Page 8
Insert the rods into the side holes in the push button housing in the center of the cover. Press down on the push buttons until they click into place in the housing. 1066117-X2-B Kohler Co.
Adjust the water level in the tank by squeezing and sliding the C-clip on the float rod. • To raise the water level, slide the C-clip up. • To lower the water level, slide the C-clip down. Kohler Co. 1066117-X2-B...